Yes. Electricity availability and grid capacity are the primary constraints determining where AI infrastructure can scale.
| Factor | Impact | Notes |
|---|---|---|
| Electricity Supply | Critical | Limits total compute capacity |
| Grid Transmission | Bottleneck | Often slower than demand growth |
| Power Density | Increasing | AI workloads require significantly higher energy |
AI systems are fundamentally constrained by energy availability. Even when capital and demand exist, infrastructure deployment is often blocked by grid limitations.